Sourcing utility
Supplier quote comparator
Type each quote as written — unit price, currency, MOQ, freight, sample cost, payment fee and lead time. The tool converts everything at your typed rates into one landed unit cost and order total, flags the cheapest vendor and any MOQ shortfall, and compares unit costs across your own quantity tiers. Rates are manual; nothing is fetched or uploaded.
Order settings
Rates are manual: enter the conversion to one unit of your base currency (e.g. USD → CNY 7.2). Nothing is fetched.
Landed-cost comparison
Landed unit cost = (price × qty × rate + freight + sample + fee) ÷ qty. Fee % applies to the converted goods value.
Unit cost by quantity
Save & export
Plans save to this browser only. Share links carry numbers and currencies — supplier names are left out.
How to read it
Every row is the full payable for one supplier at your planned quantity, converted to the base currency: goods value, international freight, sample cost and payment fee — then divided by quantity for a comparable unit cost. MOQ capital shows the cash each vendor locks up at its minimum order; a yellow row means your quantity is below that MOQ. The quantity table re-runs every supplier at each tier so you can see the cheapest flip as fixed fees dilute.
Example
Buying 500 units: supplier A quotes $2.00/pc (USD→CNY 7.2) + ¥3,000 freight + ¥200 sample + 3% fee → landed ¥21.23/pc. Supplier B quotes ¥18/pc + ¥1,200 freight + ¥100 fee → ¥20.60/pc. At 100 units though, A jumps to ¥53.5/pc while B stays ¥19.5 — the tier table surfaces that flip.
Frequently asked
How is the landed unit cost calculated?
Landed unit cost = (unit price × quantity × exchange rate + freight + sample cost + payment fee) ÷ quantity. The payment fee can be a percent of the goods value, a fixed amount, or both — the percentage applies to the converted goods value. The page itemizes each vendor's formula so you can audit it against the original quote.
Do I enter exchange rates myself? Does it fetch live rates?
Rates are manual in this version — for each quote currency you enter the conversion to one unit of your base currency (e.g. base CNY, quote USD → 7.2). That lets you use the actual settlement or locked-in rate from your payment channel rather than a mid-market ticker.
What does the MOQ “capital” column mean?
MOQ × unit price × rate — the minimum goods value this vendor locks up per order. When your planned quantity falls below a vendor's MOQ, that row gets a warning: ordering is still possible but you should re-evaluate at MOQ volume and its cash/inventory pressure.
Why is the sample cost amortized into the unit cost?
One-off charges like samples and tooling dilute over a batch, but every vendor has them, so folding them in is the fair comparison. At small quantities it matters a lot — a ¥200 sample adds ¥0.4/pc over 500 units but ¥2/pc over 100.
What is the multi-quantity comparison for?
Freight and samples are fixed costs, so unit cost falls as quantity rises — and the cheapest vendor can flip between tiers. Set 3–5 custom quantities and the table shows each vendor's unit cost per tier plus who wins, which is how you catch small-batch vs bulk reversals.
Is lead time part of the cost formula?
No — lead time is a separate comparison column. It affects cash tied up in transit and stockout risk rather than the sticker math: at equal unit cost, 30-day sea and 15-day air still cost different working capital, so weigh that separately.
Are my quotes saved or uploaded anywhere?
Everything computes in the browser — nothing uploads. Saved plans live in this device's localStorage and restore on the next visit. Copy summary, CSV export and share links are generated locally; the share link carries plan parameters, so remove supplier names before sharing if they're confidential.